* The crew shows up on time. |
In the time slot of the day of your choice from our install calendar. |
X |
* Condenser installed at correct manufacturers clearance. |
The Condenser needs air to operate. |
x |
* Old refrigerant flushed using RX11 line flush. |
We have to prepare your copper lines for the new environmentally friendly R410A Refrigerant. |
x |
* Line drier either installed on site, or factory pre-installed. |
This is like an oil filter for your system. |
X |
* All welds electronically checked. |
We don’t want any pesky leaks! |
x |
* Balanced charge, complete startup. |
You want the right amount, down to the ounce, to be perfectly comfortable. |
X |
* Vacuum pulled to 500 microns. |
We use electronic micrometers. Kinda fancy. |
x |
* Plenums mechanically fastened and sealed to air handler. |
The Plenum is basically the outlet, and the inlet for your air flow. Pretty important. |
x |
* Automatic overflow shutoff switch on airhandler. |
I bet you know what a leaking air handler will do to your floor or ceiling. |
X |
* Old equipment hauled away and recycled. |
No big pile of trash out by the road! |
X |
* Job site cleaned up, all debris hauled back to warehouse. |
We have been told that its cleaner after we leave. (We not maids, but we respect your home!) |
X |
* New Air Handler Base, or rebuild existing built in base. |
Either way, its up to code, and done to best practices for your existing installation. |
X |
* New Cladlight Hurricane Condenser Pad, or level existing base. |
This is required, and we do not use a plastic pad, no way! |
x |
*Start up and test system |
We will show you how to use your new system. |
x |
*Warranty Registration |
We will make sure you get your new system registered for your 10 year parts warranty! |
X |